Searchresults

Inspection gates for Bleiloch and Hohenwarte dams  
Inspection gates for Bleiloch and Hohenwarte dams Various refurbishment activities are required for the medium-term continuous operation of the power station at the Bleiloch and Hohenwarte...  
Survey and maintenance planning for right-hand roller gate  
Survey and maintenance planning for right-hand roller gate The oldest weir system on the river Main showed very serious vibrations during operation in 2008. The right-hand roller gate was drained in...  
Drive Unit for New Kattwyk Railway Bridge  
Drive Unit for New Kattwyk Railway Bridge The new Kattwyk railway bridge spans the Süderelbe river between the Hamburg districts Moorburg and Wilhelmsburg. It is located at a distance of approx. 56...  
Flood protection gate  
Flood protection gate The new flood barrage is used as flood protection for the Ladenburg side canal and the town of Ilvesheim and was constructed as a replacement for the old flood barrage. The...  
Pumped storage scheme Venda Nova III/Frades II  
Pumped storage scheme Venda Nova III/Frades II Venda Nova III power station is located on the Rabagao river in the north of Portugal and is the largest pumped storage scheme in Portugal with an...  
Feasibility study regarding complete refurbishment / new construction  
Feasibility study regarding complete refurbishment / new construction Neckarsulm weir is located at kilometre point 107.07 of the river Neckar and was constructed on a rock foundation in 1925. It is...  
Modernisation and repair of three locks  
Modernisation and repair of three locks The three locks of Neckargemünd, Hirschhorn and Obertürkheim are located on the river Neckar; they were constructed between 1931 and 1959 as twin locks in...  
Intake gate  
Intake gate The closing structure is a double-curved dam wall with a height of 100 m above the foundation sill. The wall crest is located at an elevation of 480 m above the sea level. The wall crest...  
Mechanical equipment for the new ship lift  
Mechanical equipment for the new ship lift The new ship lift of Niederfinow is intended to replace the old ship lift which has been in operation since 1934. The new ship lift is designed as a...  
5th lock chamber  
5th lock chamber Due to the old age of the existing locks, another (fifth) lock chamber was planned for Brunsbüttel. The services rendered by IRS together with their subcontractor DriveCon comprised...  
###SPINNER###
Search results 31 until 40 of 67

search filters

px