Berg river dam (South Africa)
The Berg river project was launched in order to improve water supply to the Western Cape region of South Africa, in particular the conurbation of Cape Town. The project was implemented by the Trans Caledon Tunnel Authority on behalf of the Department of Water Affairs.
Scope of planning:
- Sliding gate, 3 m x 5 m, with connected lining including hydraulic drive unit
- Pressure cover
Structural planning
Technical equipment
Other projetcs
-
Weir Stuhlmüller
Berghausen
-
Weir Petershagen
Petershagen
-
Weir Drakenburg
Drakenburg
-
Fischpass Doesburg
Doesburg, Netherlands
-
Schluchseewerke
Bad Säckingen
-
5 Weirs on the River Main
Erlabrunn, Harrbach, Steinbach, Rothenfels, Freudenberg
-
Old Lock
Kiel-Holtenau
-
Flood retention reservoir
Beimbach
-
Pumped storage scheme
Waldeck, Edersee
-
rack cleaning machine
Megolo, Italy
-
Limbach Weir
Limbach, Main
-
Xayaburi dam
Mekong, Laos
-
Standard mitre gates
Neckar
-
Roller gate survey
Viereth, Main
-
Neckarsulm Weir
Neckarsulm, Neckar
-
Besigheim Lock
Besigheim, Neckar