Complete refurbishment of Petershagen (Petershagen)

The Petershagen weir system had to be reassessed statically with regard to short-term continued use due to its general state of deterioration and the damage identified in the course of an inspection by WSV.

For this purpose, the asbuilt documentation was reviewed pursuant to the TbVS memo and the former load and computation approaches were reassessed. The damage identified was consequently compiled in an invitation to tender in the course of a refurbishment plan.

In this respect, an existing auxiliary installation structure (bracing) was redesigned so that it was capable of supporting the gate and the enclosure (PAH/asbestos site).

Project planning
Structural engineering
Survey

px