Complete refurbishment of Petershagen (Petershagen)
The Petershagen weir system had to be reassessed statically with regard to short-term continued use due to its general state of deterioration and the damage identified in the course of an inspection by WSV.
For this purpose, the asbuilt documentation was reviewed pursuant to the TbVS memo and the former load and computation approaches were reassessed. The damage identified was consequently compiled in an invitation to tender in the course of a refurbishment plan.
In this respect, an existing auxiliary installation structure (bracing) was redesigned so that it was capable of supporting the gate and the enclosure (PAH/asbestos site).
Project planning
Structural engineering
Survey
Other projetcs
-
Weir Stuhlmüller
Berghausen
-
Weir Drakenburg
Drakenburg
-
Fischpass Doesburg
Doesburg, Netherlands
-
Schluchseewerke
Bad Säckingen
-
5 Weirs on the River Main
Erlabrunn, Harrbach, Steinbach, Rothenfels, Freudenberg
-
Old Lock
Kiel-Holtenau
-
Flood retention reservoir
Beimbach
-
Pumped storage scheme
Waldeck, Edersee
-
rack cleaning machine
Megolo, Italy
-
Limbach Weir
Limbach, Main
-
Xayaburi dam
Mekong, Laos
-
Standard mitre gates
Neckar
-
Roller gate survey
Viereth, Main
-
Neckarsulm Weir
Neckarsulm, Neckar
-
Besigheim Lock
Besigheim, Neckar