Weir Drakenburg (Drakenburg)
The Drakenburg weir system had to be reassessed statically with regard to short-term continued use due to its general state of deterioration and the damage identified in the course of an inspection by WSV.
For this purpose, the as-built documentation was reviewed pursuant to the TbVS memo and the former load and computation approaches were reassessed. The damage identified was consequently remedied in accordance with a refurbishment plan and implementation.
In this respect, an auxiliary installation structure (bracing) was designed to support the gate and the en-closure (PAH/asbestos site).
Project planning
Structural engineering
Survey
Other projetcs
-
Weir Stuhlmüller
Berghausen
-
Weir Petershagen
Petershagen
-
Fischpass Doesburg
Doesburg, Netherlands
-
Schluchseewerke
Bad Säckingen
-
5 Weirs on the River Main
Erlabrunn, Harrbach, Steinbach, Rothenfels, Freudenberg
-
Old Lock
Kiel-Holtenau
-
Flood retention reservoir
Beimbach
-
Pumped storage scheme
Waldeck, Edersee
-
rack cleaning machine
Megolo, Italy
-
Limbach Weir
Limbach, Main
-
Xayaburi dam
Mekong, Laos
-
Standard mitre gates
Neckar
-
Roller gate survey
Viereth, Main
-
Neckarsulm Weir
Neckarsulm, Neckar
-
Besigheim Lock
Besigheim, Neckar